This customer had no footing under the 3 coulmns supporting the patio's roof. The weight made the patio crack and settle. We removed the patio and dug out for the footings and poured a mono slab. Then the columns were re-attached and stuccoed to show no signs of construcion work.
This pool was in need of new cool deck paint. It use to be a gray color that had major stains and some cracks. The cracks were repaired then textured to match surrounding areas, then two coats of cool deck paint were applied.
The pool here suffered from a lot of traffic. We fixed some cracks, applied texture to match surrounding area then gave it two coats of cool deck paint.
Comments
Post a Comment